Raleigh E&SC Plan Requirements: 2026 Compliance Guide for Contractors
When Does Raleigh Require an E&SC Plan? Raleigh requires an approved Erosion and Sedimentation Control Plan for any land-disturbing activity that uncovers more than 12,000 square feet — roughly 0.28 acre, and far below North Carolina's one-acre state...
Charlotte E&SC Plan Requirements: 2026 Compliance Guide
Do You Need an E&SC Plan in Charlotte or Mecklenburg County? Charlotte requires an approved Erosion and Sediment Control (E&SC) Plan before any land-disturbing activity that uncovers one acre or more — 43,560 square feet — under Article 28 of the...
Does a Loudoun County Data Center Need a SWPPP? Northern Virginia 2026
A Loudoun County data center that disturbs 1 acre or more needs coverage under Virginia’s VPDES Construction General Permit (VAR10), administered by DEQ through the local Virginia Erosion and Stormwater Management Program. Coverage requires a Registration...
Colorado Springs Stormwater Management Plan (SWMP): Do You Need One in 2026?
Colorado does not call it a SWPPP. Construction disturbing 1 acre or more in Colorado Springs needs a Stormwater Management Plan (SWMP) under CDPHE construction general permit COR400000, plus city grading and erosion control approval from the Colorado Springs...
Miami-Dade & Broward SWPPP Requirements: Do You Need One in 2026?
Construction that disturbs one acre or more in Miami-Dade or Broward County requires coverage under the Florida DEP Generic Permit for Stormwater Discharge from Large and Small Construction Activities. Coverage means a written SWPPP completed first, then a Notice of...
Tampa SWPPP Requirements: 2026 Compliance Guide for Contractors
Do You Need a SWPPP in Tampa or Hillsborough County? Construction in Tampa or unincorporated Hillsborough County that disturbs one acre or more, including smaller parcels inside a common plan of development, needs a SWPPP and a Notice of Intent filed with the Florida...
El Paso SWP3 Requirements: 2026 Compliance Guide for Contractors
Do You Need an SWP3 in El Paso? Construction in El Paso that disturbs one acre or more requires an SWP3, the Texas name for a construction stormwater plan, under TCEQ Construction General Permit TXR150000. Sites of five acres or more must also file a Notice of Intent...
Fort Worth SWP3 Requirements: 2026 Guide for Tarrant County Contractors
What Are the SWP3 Requirements in Fort Worth, Texas? Any construction project in Fort Worth that disturbs one acre or more needs a Stormwater Pollution Prevention Plan, called an SWP3 in Texas, under TCEQ Construction General Permit TXR150000. Sites of five acres or...